sci16082 — Announcement

Special proposals require 2016A PIT

January 19, 2016

In preparation for the start of 2016A, all Fast Turnaround (FT), Director's Discretionary (DD) time, and Poor Weather (PW) proposals must use the 2016A Phase I Tool (PIT). See the PIT Version Table for more information and download links.

About the Announcement

Id:
ID
sci16082