More detector, dewar and Arcon work - Ramon Galvez , August 16th, 2002
Done:
- Tested the new macro thresholds set for cryo alarms. Working ok.
- With Rolo C. we made changes in the Hydra option of ‘SetFiles’. The waveforms and sequencer code are automatically installed now when Hydra + Arcon3.7 are selected.
- Tests were done also when switching back and forth for other ccds.
- With Ricardo V., we smoothly went through the LN2 solidification using the new device:
Normal operation vac sensors readouts
CCD dwr vac before pumping | : 300 Torr |
CCD dwr vac after pumping | : 0 mT |
LN2 flask vac after refill | : 400 Torr |
LN2 flask vac for solid state | : 20 Torr ( after 1hr pumping ) |
To be done after this run (minor pending details) :
- Improve the ‘solid N2’ valve setpoint lock device.
- Install the new adjustable security ‘pop-up’ pressure valve.