David Moe lifting the IGRINS-2 electronics rack onto the flatbed and placing it next to the IGRINS-2 instrument crate (on the left of the flatbed) at Gemini North Hilo Base Facility heading to the summit on Friday 15 September.
David Moe lifting the IGRINS-2 electronics rack onto the flatbed and placing it next to the IGRINS-2 instrument crate (on the left of the flatbed) at Gemini North Hilo Base Facility heading to the summit on Friday 15 September.
About the Image
Id: | sci23054b |
Type: |
Photographic |
Release date: |
October 6, 2023, 4:28 pm |
Related announcements: |
sci23054
|
Size: | 1280 x 835 px |