Dome and provisional crane
A provisional crane was installed near the top of the dome to enable assembly of the Telescope Mount Assembly (TMA) on the telescope pier.
Credit:Rubin Observatory/NSF/AURA
About the Image
Id: | rubin-246797ea-a85b-46fd-9696-1fcb8d06ee49-2 |
Type: | Photographic |
Release date: | Jan. 14, 2020 |
Size: | 864 x 1152 px |
About the Object
Name: | Cerro Pachón |
Category: | Vera C. Rubin Observatory |