Vera C. Rubin Observatory 28 Aug. 2020

An inspection of the summit facility and equipment was performed on August 28, 2020, after some bad weather moved through the area. In general the facilities including TMA, Dome, Power, Water lines, Casino (cafeteria), Warehouse, (M1M3), etc, are in good condition.

Credit:

Rubin Obs/NSF/AURA

About the Image

Id:rubin-20200828_090501
Type:Photographic
Release date:Nov. 28, 2020, 6:23 a.m.
Size:4032 x 2268 px

About the Object


Image Formats

Large JPEGLarge JPEG
2.0 MB
Screensize JPEGScreensize JPEG
229.1 KB

Zoomable


Wallpapers

1024x7681024x768
298.0 KB
1280x10241280x1024
451.4 KB
1600x12001600x1200
618.5 KB
1920x12001920x1200
705.2 KB
2048x15362048x1536
3.5 MB