Summit Construction Progress March 2019

The summit has been buzzing with activity this month; highlights include the ongoing assembly and verification of the Coating Plant, Secondary Mirror (M2) cell assembly unpacking and integration with the M2 cart, and progress on the Dome, including installation of the side wall purlins and upper dome platform.

Créditos:

Rubin Observatory/NSF/AURA

About the Image

Id:rubin-20190305-151953
Tipo:Photographic
Release date:15 de Marzo de 2019
Size:4032 x 1960 px

Sobre el Objeto


Formatos de Imágenes

Large JPEGLarge JPEG
2,0 MB
Screensize JPEGScreensize JPEG
257,5 KB

Zoomable


Fondos de Pantalla

1024x7681024x768
357,4 KB
1280x10241280x1024
530,7 KB
1600x12001600x1200
724,4 KB
1920x12001920x1200
844,5 KB
2048x15362048x1536
3,2 MB