M1M3 Electrical Cabinet Assembly
Construction of the M1M3 Support System Cabinet at vendor Bit By Bit Controls in Tucson. When finished, this cabinet will house connections to the electrical power, communications, and sensors required to operate the M1M3 cell assembly.
Credit:Rubin Observatory/NSF/AURA
About the Image
Id: | rubin-dsc-0299 |
Type: | Photographic |
Release date: | May 9, 2018 |
Size: | 3464 x 4618 px |
About the Object
Name: | Tucson, AZ |
Category: | Vera C. Rubin Observatory |