Vera C. Rubin Observatory staff remove the M1M3 cell and surrogate mass from the telescope mount.
Vera C. Rubin Observatory summit staff remove the Primary/Tertiary (M1M3) mirror cell and surrogate mirror from the telescope mount in January 2024 and move it to the Level 3 maintenance and integration hall in the Observatory.
Credit:Rubin Observatory/NSF/AURA/M. Rivera
About the Image
Id: | rubin-202401_M1M3cellmove_13-CC |
Type: | Photographic |
Release date: | Feb. 9, 2024, 3:29 p.m. |
Size: | 4624 x 3472 px |
About the Object
Category: | Vera C. Rubin Observatory |