Rubin Auxiliary Telescope 28 Aug. 2020

An inspection of the summit facility and equipment was performed on 28 August 2020, after some bad weather moved through the area. In general, the facilities including TMA, Dome, Power, Water lines, Casino (cafeteria), Warehouse, (M1M3), etc, are in good condition.

Créditos:

Rubin Obs/NSF/AURA

About the Image

Id:rubin-20200828_090649
Tipo:Photographic
Release date:12 de Diciembre de 2020 a las 10:57
Size:4032 x 2268 px

Sobre el Objeto


Formatos de Imágenes

Large JPEGLarge JPEG
1,8 MB
Screensize JPEGScreensize JPEG
223,8 KB

Zoomable


Fondos de Pantalla

1024x7681024x768
268,8 KB
1280x10241280x1024
409,1 KB
1600x12001600x1200
560,6 KB
1920x12001920x1200
665,6 KB
2048x15362048x1536
3,2 MB