Summit Inspection May 26, 2020
A regular inspection of the Cerro Pachón construction site took place on May 26th. This visit included more work on the Dome and a detailed inspection of Telescope Mount Assembly (TMA) stored materials, as requested by TMA vendor Asturfeito.
Credit:Rubin Observatory/NSF/AURA
About the Image
Id: | rubin-20200526-095853 |
Type: | Photographic |
Release date: | June 4, 2020 |
Size: | 5312 x 2988 px |
About the Object
Name: | Cerro Pachón |
Category: | Vera C. Rubin Observatory |
Image Formats
Large JPEG
2.6 MB
Publication TIFF 4K
10.6 MB
Publication JPEG
1.6 MB
Screensize JPEG
187.1 KB