Summit Facility 4th Floor Service and Maintenance
90-degree view of the service and maintenance area from the fourth floor. The Facility contractors are finishing up some of the details near the 50-ton crane (yellow beams). The penetrating daylight comes from the unfinished vertical lift shaft siding behind the right wall .
Credit:Rubin Observatory/NSF/AURA
About the Image
Id: | rubin-20180220-130224 |
Type: | Photographic |
Release date: | Feb. 21, 2018 |
Size: | 7824 x 3120 px |
About the Object
Name: | Cerro Pachón |
Category: | Vera C. Rubin Observatory |
Image Formats
Large JPEG
4.1 MB
Publication TIFF 4K
8.2 MB
Publication JPEG
1.4 MB
Screensize JPEG
196.3 KB