Gemini South primary mirror prep (shutdown & re-coating)
The primary mirror is prepped with paper towels for stripping prior to recoating in protected silver during the 2010 Gemini South engineering shutdown.
Credit:International Gemini Observatory/NSF NOIRLab/AURA/J. Pollard
About the Image
Id: | noirlab-mg-2568 |
Type: | Photographic |
Release date: | July 19, 2020, 1:32 a.m. |
Size: | 2912 x 4368 px |
About the Object
Name: | Gemini South |
Category: | Gemini Observatory People and Events |