Commissioning Sequence Graphic (horizontal)
These are the important steps in the sequence of the construction and commissioning of NSF–DOE Vera C. Rubin Observatory towards Rubin ‘First Look’. The team of engineers and scientists have just finished “ComCam Removal.” A vertical version of this infographic can be found here.
Credit:RubinObs/NOIRLab/SLAC/NSF/DOE/AURA/J. Pinto
About the Image
Id: | ann25002b |
Type: | Artwork |
Release date: | Jan. 14, 2025, 10:22 a.m. |
Related announcements: | ann25002 |
Size: | 20833 x 8333 px |
About the Object
Category: | Vera C. Rubin Observatory |