¡Lo sentimos! Esta página aún no está disponible en su idioma preferido, por lo que estamos mostrando la versión original.
Base Facility in La Serena
Preliminary drawing of the LSST Base Facility in La Serena, which will include office space for LSST, CTIO, SOAR, and AURA-O operations as well as the LSST Data Center in Chile. Remodeling of the existing structure and site preparation for the new construction will begin in July 2016.
Créditos:Rubin Observatory/NSF/AURA
About the Image
Id: | rubin-imagen-7-2016-05-12 |
Tipo: | Simulation |
Release date: | 12 de Abril de 2017 |
Size: | 2048 x 880 px |
Sobre el Objeto
Categoría: | Illustrations Vera C. Rubin Observatory |