Some of the team that installed the Cassegrain rotator back to the telescope.
Some of the team that installed the Cassegrain rotator back to the telescope. after the helium lines replacement and preventive maintenance of the fiber optics, as part of the Gemini South shutdown 2024. From left to right. Hector Figueroa (mechanical technician), Sandra Rojas (safety coordinator), Pablo Diaz (telescope manager)), Iver Rojas (mechanical technician), Manuel Torres (electronics technician), Alfredo Torres (mechanical technician), Sebastian Olivares (mechanical engineer).
About the Image
Id: | sci24055a |
Type: |
Photographic |
Release date: |
August 28, 2024, 4:48 pm |
Related announcements: |
sci24055
|
Size: | 1280 x 946 px |