David Moe lifting the IGRINS-2 electronics rack onto the flatbed and placing it next to the IGRINS-2 instrument crate (on the left of the flatbed) at Gemini North Hilo Base Facility heading to the summit on Friday 15 September.

David Moe lifting the IGRINS-2 electronics rack onto the flatbed and placing it next to the IGRINS-2 instrument crate (on the left of the flatbed) at Gemini North Hilo Base Facility heading to the summit on Friday 15 September.

About the Image

Id:sci23054b
Type: Photographic
Release date: October 6, 2023, 4:28 pm
Related announcements: sci23054
Size:1280 x 835 px