IGRINS-2 in the lab.
After the second Telescope Integration run, IGRINS-2 was opened up in the Gemini North Instrument Lab for maintenance tasks, which included replacing temperature sensors, the vacuum gauge, a coldhead unit, and electronics connectors.
About the Image
Id: | sci24014b |
Type: | Photographic |
Release date: | February 12, 2024, 9:03 pm |
Related announcements: | sci24014 |
Size: | 4032 x 3024 px |