Rubin Summit Facility Inspection
An inspection of the summit facility and equipment was performed on August 28, after some bad weather moved through the area. In general the facilities including TMA, Dome, Power, Water lines, Casino (cafeteria), Warehouse, (M1M3), etc, are in good condition. Here the Rubin Auxiliary Telescope is seen.
Credit:Rubin Obs/NOIRLab/NSF/AURA
About the Image
Id: | rubin-20200828_084929 |
Type: | Photographic |
Release date: | Oct. 5, 2021, 1:53 a.m. |
Size: | 4032 x 2268 px |
About the Object
Image Formats
Large JPEG
1.9 MB
Publication TIFF 4K
14.0 MB
Publication JPEG
1.9 MB
Screensize JPEG
208.2 KB