Vera C. Rubin Observatory summit staff remove the M1M3 mirror cell and surrogate mass from the telescope mount.
Vera C. Rubin Observatory summit staff remove the Primary/Tertiary (M1M3) mirror cell and surrogate mirror from the telescope mount in January 2024 and move it to the Level 3 maintenance and integration hall in the Observatory.
Créditos:Rubin Observatory/NSF/AURA
About the Image
Id: | rubin-Cellmove-1-CC |
Tipo: | Photographic |
Release date: | 9 de Febrero de 2024 a las 15:25 |
Size: | 9248 x 6944 px |
Sobre el Objeto
Categoría: | Vera C. Rubin Observatory |
Formatos de Imágenes
Large JPEG
11,7 MB
Publication TIFF 4K
18,5 MB
Publication JPEG
2,6 MB
Screensize JPEG
255,2 KB